New two-foot coaches and some more of the gardens


George Sholto under wraps in the locomotive shed
Now that most of the boiler-related work has been done on George Sholto, it has been transferred to the locomotive shed where it is sitting under a plastic sheet. The next task will be to fit the driver's cab and saddle tank before finishing off all the remaining little jobs.

This makes room in the workshops for construction of two new carriages for the two-foot Nursery Line. As Bevan can pull three of Bressingham's five two-foot carriages, a couple more are needed to enable both George Sholto and Bevan to operate together. It also means that if one carriage has to be taken out of service for repair, the operational impact is considerably reduced.